Custom builds by KHB Construction — Ground-up custom homes, from foundation to final fixture, for clients who want the process as much as the result.
Services

Custom builds
Custom Home Builder — Central Valley & Sierra Foothills

Ground-up custom homes, from foundation to final fixture, for clients who want the process as much as the result.
The work

A custom home is the longest project we take on — the design phase alone is measured in months, and the build in seasons. It's a commitment we make selectively, because a ground-up build deserves the same one-team accountability as our remodels: the people who design it, engineer it, and build it answer to each other inside one company.

What custom means to us is not a floor plan from a catalog with upgraded counters. It's a house designed for one site and one household, carried by the same design-build process you can see across our remodel portfolio — one contract, one team, from the first site walk to the final fixture, under CSLB license #1070537.

Materials
Glass mosaic
Glass mosaic
Vanity backsplash
Travertine
Travertine
Modular pattern
Penny-round
Penny-round
Mosaic backsplash
Honed black slab
Honed black slab
Veined, full height
Wood-look plank tile
Wood-look plank tile
Vertical stack
Copper mosaic
Copper mosaic
Dimensional metal
Investment
Starting at $350/sqft
Custom builds start around $350 per square foot, and specification drives the final number from there — stone, millwork, the appliance package, and site conditions are the big levers.
Common questions

How much does it cost to build a custom home in the Central Valley?

Custom builds at KHB start around $350 per square foot for a fully finished home, excluding land and landscape. Specification level — stone, millwork, appliances, and site work — drives the final number, and the design phase locks that cost before construction begins.

How long does a custom home take to build?

Measured in seasons, not weeks: design alone runs months, and the build itself typically spans a year or more depending on site and complexity. The design phase locks scope, selections, and cost before ground breaks — which is what keeps the construction phase on schedule.

Begin a conversation

Tell us about the project.

We typically respond within one business day.