Kitchens by KHB Construction — Cabinetry, stone, appliances, and lighting designed as one system — built around how your household actually cooks.
Services

Kitchens
Kitchen Remodeling Contractor — Modesto & the Central Valley

Cabinetry, stone, appliances, and lighting designed as one system — built around how your household actually cooks.
The work

A kitchen is a working room, and we design it that way. Cabinetry, stone, plumbing, lighting, and appliances are specified together at the start of the project — in the design phase, on paper, where changes cost nothing — not bolted on at the end, where they cost thousands. That's the core of design-build, and it's why our kitchens come in on the number we agreed to.

The work you see across our portfolio is the honest sample: rift-cut oak and flat-panel cabinetry, waterfall islands in quartz and natural stone, full-slab backsplashes, professional-grade appliance packages, tile set by our own crews. If you've remodeled before with a contractor who framed first and figured the rest out later, the difference in process is the thing our clients talk about most.

Materials
Book-matched Carrara
Book-matched Carrara
Valley Mission — brass bridge faucet
Full-slab backsplash
Full-slab backsplash
Sunrise — pot filler at the range
Two-material island
Two-material island
Sunrise — oak and black stone
Veined stone waterfall
Veined stone waterfall
Lakeview — walnut-tone fronts
Copper mosaic
Copper mosaic
Dimensional metal backsplash
Honed black slab
Honed black slab
Sunrise — single sheet, no grout
Investment
$250K+
What moves a project up the range: structural changes (removing walls, relocating plumbing), professional appliance packages, natural stone with book-matched or waterfall slabs, custom hood work, integrated lighting design.
Common questions

How much does a kitchen remodel cost in the Central Valley?

For the level of work KHB does, most kitchens land between $95,000 and $250,000 depending on structural changes, appliances, and stone. Custom designer kitchens run past $250,000. Anything quoted far below that range is describing a different scope of work.

How long does a kitchen remodel take?

Design and selections typically run 6–12 weeks before construction. Build time depends on scope — a same-footprint remodel moves faster than one that relocates walls and plumbing. Your schedule is fixed in the design phase, before demo starts.

Do I need to move out during a kitchen remodel?

Usually not. We contain the work zone, keep a temporary kitchen setup running, and schedule the disruptive phases (demo, slab work) in concentrated windows.

Begin a conversation

Tell us about the project.

We typically respond within one business day.